Chantal and Evan’s Basement

These are possibly my favourite before pictures EVER.

Bathroom before:

Day 01 Fresh Reno Ottawa renovation contractor bathroom before

Basement before:

Day 01 Fresh Reno renovation contractor before

Day 9: The self-levelling compound, Dricore floor, framing and drywalling is done. Today is the final day of drywall mudding. Tomorrow we sand the walls. So basically an epic shoulder workout.

Day 09 Fresh Reno Ottawa renovation contractor basement renovation kanata barrhaven nepean manotick

Day 10: Sand Dune Pebble mosaic tile on the shower base.

Day 10 Fresh Reno Ottawa renovation contractor nepean barrhaven kanata manotick

Day 12: Laying laminate floor.

Day 12 Fresh Reno Ottawa renovation contractor Home Decorations Collections laminate nepean barrhaven kanata manotick

Day 13: Venetian Stone wall tile being installed in the shower.

Day 13 Fresh Reno Ottawa renovation contractor shower tile basement nepean barrhaven kanata manotick

The basement is done!

Day 16 Twitter Fresh Reno Ottawa renovation contractor basement bathroom nepean barrhaven kanata manotick 3 Day 16 Twitter Fresh Reno Ottawa renovation contractor basement bathroom nepean barrhaven kanata manotick 2 Day 16 Twitter Fresh Reno Ottawa renovation contractor basement bathroom nepean barrhaven kanata manotick 1

 