Sarah and Rob’s Basement Renovation

We first met Rob and Sarah while renovating their bathroom in 2015. They asked us back to renovate their basement.

Rob and Sarah’s basement day 1: File this under shocking things we see. That I-beam is holding up the house. Not the best spot to cut an opening for a door.

Day 01 Support beam interrupted with circle

Day 5: Framing almost finished. Dricore done. Electrical done (Salter Electrical). Plumbers are coming on Monday (Penta Plumbing) and spray foam insulation crew (O’Reilly Brothers) is coming on Tuesday.

Day 05 Fresh Reno Ottawa Renovation Contractor basement renovation framing nepean kanata barrhaven manotick

Day 10: Turning that awkward support post into an area for symmetrical built-in shelves.

Day 10 Fresh Reno Ottawa renovation contractor basement support post

Oh YUM. Thanks Rob and Sarah!

Day 15 Chocolates from Spain

Day 19: tiled the bathroom shower with 12″ x 24″ Pasha Collection tiles from Home Depot.

Day 19 Fresh Reno Ottawa renovation contractor basement bathroom nepean barrhaven kanata Pasha Collection tiles

Day 20: Drop ceiling the clients purchased from Costco.

Day 20 Fresh Reno Ottawa renovation contractor Basement ceiling

Day 22: hidden electrical panel and shoe storage.

Day 22 Fresh Reno Ottawa renovation contractor basement hide electrical panel shoe storage

Day 23: The basement is finished!

Day 23 Fresh Reno Ottawa renovation contractor basement nepean 1 Day 23 Fresh Reno Ottawa renovation contractor basement nepean 2 Day 23 Fresh Reno Ottawa renovation contractor basement nepean 3 Day 23 Fresh Reno Ottawa renovation contractor basement nepean 4 Day 23 Fresh Reno Ottawa renovation contractor basement nepean 5 Day 23 Fresh Reno Ottawa renovation contractor basement nepean 6