These are possibly my favourite before pictures EVER.
Bathroom before:
Basement before:
Day 9: The self-levelling compound, Dricore floor, framing and drywalling is done. Today is the final day of drywall mudding. Tomorrow we sand the walls. So basically an epic shoulder workout.
Day 10: Sand Dune Pebble mosaic tile on the shower base.
Day 12: Laying laminate floor.
Day 13: Venetian Stone wall tile being installed in the shower.
Natalie and Ben’s kitchen was in need of an update and they also wanted to reconfigure the layout.
Day 1: Kitchen before.
Day 5: The tiles are going down. Tiles are the Verde range from Interstone. Nice neutral colour choice.
Day 6: the tiles for Nathalie and Ben’s kitchen are laid and grouted. Cupboards go up on Monday. Have a great weekend!
Day 12: Nathalie and Ben’s kitchen is nearly done. The cupboards are in, counters are installed and backsplash tiles are done. The electricians will come by tomorrow to connect the under-cabinet lights and ceiling pot lights.
Alex and Janine recently moved to Ottawa. We worked on their plans long-distance and it all came together so well.
Ripley looooooves to play tug with his octopus. (We started a new bathroom and kitchenette reno this week, but know you’d much rather see pictures of the dog than an empty space.)
Day four: We’ve created a basement bathroom where there wasn’t one. Brought in licensed plumbers and electricians. Next up is the city inspection (which we always pass).
Day 4: Basement kitchenette where there was previously a blank space.
You will give me the banana, Don.
Basement bathroom day 9: Floor tiles are going down. 12×24 “enigma” tiles from Home Depot. Paint is ‘Frozen Pond’ by Behr.
Basement reno day 11: Subway tile installed for the kitchenette backsplash. The basement will be finished this week.
Day 14: Alex and Janine’s basement renovation is done!
Day 14: Alex and Janine’s basement renovation is done!